View Test Details for Pre-Promotion Events

Review the test results generated by a pre-promotion test run to assess whether a work item meets quality gate requirements before it advances to the next pipeline stage.

Required Editions

Available in: Lightning Experience in Professional (API access required), Enterprise, Performance, Unlimited, and Developer Editions
Not Available in: Government Cloud Plus. Contact your Salesforce account executive for more details.
Not available in: EU Operating Zone. EU Operating zone is a special paid offering that provides an enhanced level of data residency commitment. Lifecycle Center is supported in orgs in the EU that aren't part of EU OZ, per standard product terms and conditions.
User Permissions Needed
To view test details for pre-promotion events: Lifecycle Center Testing Manager OR Lifecycle Center User OR Lifecycle Center Deployment Manager

If automated testing fails during a Pre-Promotion Event, review the test results to identify which test suites or quality gate criteria blocked the promotion.

  1. From the Lifecycle Center navigation menu, select the Pipelines tab.
  2. Locate the pipeline stage — such as Integration or Staging — containing the work item you want to review, then click the sidebar in the stage to open Test Results.
  3. In the Test Results modal, review the following fields:
    • Tests Passed — the number of tests that passed out of the total run (for example, 39/40).
    • Test Execution Result — the overall outcome of the test run.
    • Quality Gate Result — whether the work item met the quality gate criteria for the destination stage.
  4. Click View Details.
    A Test Suite Group Execution record page opens, click on the realted list to see each test suite excecution details.
Note
Note If the Quality Gate Result shows failed, the promotion is blocked. Resolve the test failures before retrying the promotion.