---
schema_version: "1"
id: d4f02cf6bb7b3edde12f475773bbf074e6738599df7c8d863951de95936b7753
title: View Test Details for Pre-Promotion Events
collection: admin
version: current
locale: en-us
portal_url: https://docs.salesforce.com/admin/current/en-us/platform/264-0-0/devops_center_testing_view_test_details_pre_promotion.md
canonical_url: https://help.salesforce.com/s/articleView?id=platform.devops_center_testing_view_test_details_pre_promotion.htm&release=264.0.0&type=5
source_site: help.salesforce.com
content_type: documentation
content_hash: ff31eb7ae5b730c3c4f47b8ce117acd2865cdf1cc75b4dbce5865f1a216bac53
description: Review the test results generated by a pre-promotion test run to assess whether a work item meets quality gate requirements before it advances to the next pipeline stage.
products:
  - Salesforce Platform
release: "264"
---
# View Test Details for Pre-Promotion Events

Review the test results generated by a pre-promotion test run to assess whether a work item meets quality gate requirements before it advances to the next pipeline stage.

### Required Editions

<table class="slds-table slds-table_bordered slds-max-medium-table_stacked slds-m-bottom_small edition"><colgroup><col></colgroup><tbody><tr class=""><td class="slds-cell-wrap" style="vertical-align:top;">Available in: Lightning Experience in <strong>Professional</strong> (API access required), <strong>Enterprise</strong>, <strong>Performance</strong>, <strong>Unlimited</strong>, and <strong>Developer</strong> Editions</td></tr></tbody><colgroup><col></colgroup><tbody><tr class=""><td class="slds-cell-wrap" style="vertical-align:top;">Not Available in: <strong>Government Cloud Plus</strong>. Contact your Salesforce account executive for more details.</td></tr></tbody><colgroup><col></colgroup><tbody><tr class=""><td class="slds-cell-wrap" style="vertical-align:top;">Not available in: <strong>EU Operating</strong> Zone. EU Operating zone is a special paid offering that provides an enhanced level of data residency commitment. Lifecycle Center <em>is</em> supported in orgs in the EU that aren't part of EU OZ, per standard product terms and conditions.</td></tr></tbody></table>

<table class="slds-table slds-table_bordered slds-max-medium-table_stacked slds-m-bottom_small permission">
        <colgroup>
          <col style="width:50%">
          <col style="width:50%">
        </colgroup>
        <thead class="slds-text-title_caps ">
          <tr class="">
            <th scope="colgroup" class="slds-cell-wrap" colspan="2" style="text-align:center;vertical-align:top;" id="d23339e106">User Permissions Needed</th>
          </tr>
        </thead>
        <tbody>
          <tr class="">
            <td data-label="User Permissions Needed" class="slds-cell-wrap" style="vertical-align:top;" headers="d23339e106 ">To view test details for pre-promotion events:</td>

            <td class="slds-cell-wrap" style="vertical-align:top;" headers="d23339e106 ">Lifecycle Center Testing Manager OR Lifecycle Center User OR Lifecycle Center Deployment
              Manager</td>

          </tr>
        </tbody>
      </table>

If automated testing fails during a Pre-Promotion Event, review the test results to identify which test suites or quality gate criteria blocked the promotion.

1. From the Lifecycle Center navigation menu, select the **Pipelines** tab.
2. Locate the pipeline stage — such as Integration or Staging — containing the work item you want to review, then click the sidebar in the stage to open **Test Results**.
3. In the Test Results modal, review the following fields:
    
    - **Tests Passed** — the number of tests that passed out of the total run (for example, 39/40).
    - **Test Execution Result** — the overall outcome of the test run.
    - **Quality Gate Result** — whether the work item met the quality gate criteria for the destination stage.
4. Click **View Details**.
    
    A Test Suite Group Execution record page opens, click on the realted list to see each test suite excecution details.

![Note](https://sf-zdocs-cdn-prod.zoominsoftware.com/tdta-platform-devops_center-264-0-0-production-enus/166010c3-4c34-4087-92ad-aea917baf524/images/icon_note.png)

Note If the **Quality Gate Result** shows failed, the promotion is blocked. Resolve the test failures before retrying the promotion.

#### See Also

- [On-Demand Testing for Pre-Promotion Events](https://help.salesforce.com/s/articleView?id=platform.devops_center_testing_on_demand_pre_promotion.htm&release=264.0.0&type=5 "If a Pre-Promotion Event fails, on-demand testing lets you manually verify whether tests are now passing. A new automated execution runs when the promotion is attempted again. This is most commonly used when a promotion is blocked by a failed quality gate and you need to re-trigger testing after resolving the underlying issue.")