Work Outside the Lifecycle Center UI

Use your preferred local development tools to work on Lifecycle Center work items and commit changes directly to source control. After merging your changes, complete the promotion in Lifecycle Center.

Required Editions

Available in: Lightning Experience in Professional (API access required), Enterprise, Performance, Unlimited, and Developer Editions
Not Available in: Government Cloud Plus. Contact your Salesforce account executive for more details.
Not available in: EU Operating Zone. EU Operating zone is a special paid offering that provides an enhanced level of data residency commitment. Lifecycle Center is supported in orgs in the EU that aren’t part of EU OZ, per standard product terms and conditions.
Note
Note This feature works differently in Lifecycle Center and DevOps Center (Managed Package). This information pertains to Lifecycle Center. To learn about this feature in DevOps Center (Managed Package), see Work Outside of DevOps Center (Managed Package).
User Permissions Needed
To work outside and commit change to the Lifecycle Center source control: Lifecycle Center User in Lifecycle Center Hub org

Create a work item in Lifecycle Center. See Create and Assign Work Items.

  1. In Lifecycle Center, select an existing work item.
  2. Change the work item status to In Progress.

    Lifecycle Center creates a feature branch in your repository and displays the branch URL.

    Tip
    Tip Alternatively, you can create a branch manually from the first pipeline stage's branch. Name the branch using your work item number. For example, WI-000015.
  3. Open your local terminal or IDE, and check out the feature branch.
  4. Develop and test changes locally.
  5. Commit your changes, and push the feature branch to your remote repository.
  6. In your source control repository, create a pull request (PR) from your feature branch to the first pipeline stage branch (Integration).
  7. Review, approve, and merge the pull request.
    Your changes may take a few moments to appear in Lifecycle Center. For metadata and data changes, wait for Lifecycle Center to sync your remote changes before acting on related objects. For non-metadata changes, such as updates to the .forceignore file, you can continue with the promotion immediately.
  8. In Lifecycle Center, open the work item, and change its status to Ready to Promote.

Your Deployment Manager can now go to the Lifecycle Center Pipelines tab and complete the promotion. See External Merges.