You can add a hierarchy to a bar graph or pie chart widget.
| REQUIRED USER ROLE | |
|---|---|
| To add a drill-down hierarchy to a widget | Admin and Power User |
- On the Visualize tab, select the bar graph or pie chart widget.
- Click the edit icon, and then click the Design tab.
- Click Interactions, and select Drill Down.
- In the dropdown, select the hierarchy.