Change a Report's Schedule

You can change an already scheduled report on the Schedule Report page.

Required Editions

Available in: Salesforce Classic
Available in: Professional, Enterprise, Performance, Unlimited, and Developer Editions
Available in: Enhanced Folder Sharing
User Permissions Needed
To create, edit, and delete reports:
Enhanced Folder Sharing
Schedule Reports

Watch video demo Tips for Scheduling Reports (Salesforce Classic)

  1. On the Reports tab, click the name of the scheduled report.
  2. Click Schedule Future Runs from the Run Report dropdown menu.
  3. Make the required changes on the Schedule Report page.
  4. Click Save Report Schedule.