---
schema_version: "1"
id: a281f31ee5975934ee17397607ca5b8396eccf3f6313e3ac0e76a5e6ddc10302
title: Server Upgrade - Disable Scheduled Tasks
collection: tableau
version: next
locale: en-gb
portal_url: https://docs.salesforce.com/tableau/next/en-gb/server-linux/server-upgrade-baseline-disable-tasks.md
canonical_url: https://help.tableau.com/v0.0/server-linux/en-gb/server-upgrade-baseline-disable-tasks.htm
source_site: help.tableau.com
content_type: documentation
content_hash: d35940cd4d7fd9bc741fb3af4c27cb0fd9406060c7b6edefccfc1c12c3912761
description: Disable scheduled tasks before upgrading Tableau Server.
---
[Skip to main content](#main-content)

# Server Upgrade - Disable Scheduled Tasks

**Important:** We strongly recommend disabling scheduled tasks before you perform an upgrade. This includes all updates to data content and should be done before you create your pre-upgrade backup. This may involve disabling jobs that are triggered outside of Tableau Server, such as those initiated through REST API-based extract refreshes or using tabcmd.

Run the following procedure to disable all scheduled extract refreshes, flows and subscriptions.

1. [Sign in to the Tableau Server Admin Area](https://help.tableau.com/v0.0/server-linux/en-gb/sign_in_server_admin.htm) as the Tableau Server administrator.
2. Go to the server-wide Schedules page:
    
    - On a Tableau Server where only a single (Default) site exists, click Schedules in the left pane.
    - On a Tableau Server with more than one site, click Manage all sites in the drop-down menu on the top of the left pane, and then click Schedules.
3. On the Schedules page, click Select All.
4. On the Actions menu, select Disable, and then click Disable in the resulting prompt.

Continue to: [Single-Server Upgrade -- Run Setup](https://help.tableau.com/v0.0/server-linux/en-gb/server-upgrade-baseline-singlenode-setup.htm), or [Multi-node Upgrade -- Run Setup](https://help.tableau.com/v0.0/server-linux/en-gb/server-upgrade-baseline-multinode-setup.htm)