---
schema_version: "1"
id: 71ff7a339bdc64a9d742911da4deab79fc658075bf021adf50940eb6a386c8f7
title: Modifying Schedules
collection: mulesoft
version: current
locale: en-us
portal_url: https://docs.salesforce.com/mulesoft/current/en-us/api-functional-monitoring/afm-modify-schedule.md
canonical_url: https://docs.mulesoft.com/api-functional-monitoring/afm-modify-schedule
source_site: docs.mulesoft.com
content_type: documentation
content_hash: 772767386586099d470f028473dfeeb09efb682d523a18a6d51dec7137961439
description: MuleSoft Documentation Site
latest: true
---
---
product: API Functional Monitoring
---

# Modifying Schedules

> For the full documentation index, see: https://docs.mulesoft.com/llms.txt

You can modify a schedule to change:

- The location at which the test is run

- The frequency at which to run the test

## Before You Begin

- Before you run a schedule in a public location, ensure that your Anypoint Platform organization
  has not reached its maximum number of schedules. When you attempt to create a new monitor, a
  message displays if no public schedules are available.

- Ensure that your user ID has the following permission set in Access Management:

  - **Exchange > Exchange Administrator** or **Exchange > Exchange Contributor**

An Anypoint Platform administrator for your organization grants permission. See
[Manage Permissions](https://docs.mulesoft.com/access-management/managing-permissions).

## Modify a Schedule

Modify a schedule either from the **Schedules** section of a monitor, or from the schedules list.

To modify a schedule from the **Schedules** section of a monitor:

1.  Select the monitor in which you want to modify a schedule.

2.  Find the schedule in the list, click **More**
    (![afm ui more button](/mulesoft/current/en-us/api-functional-monitoring/_images/afm-ui-more-button.png)), and select **Modify Schedule**.

3.  In the **Modify Schedule** dialog, change one or more of the following:

    - The location at which to run the test

    - The frequency at which to run the test

4.  Click **Save**.

To modify a schedule from the schedules list:

1.  Display the list of locations by opening the **Locations manager** dialog in the homepage.

2.  Select the location in which the schedule is running.

3.  Find the schedule in the list, click **More**
    (![afm ui more button](/mulesoft/current/en-us/api-functional-monitoring/_images/afm-ui-more-button.png)), and select **Modify Schedule**.

4.  In the Modify Schedule dialog, change one or more of these items:

    - The frequency at which to run the test

    - The configuration to run the test

5.  Click **Save**.

    Changes take place after the current interval elapses. For example, if you change the interval
    of a schedule from every 15 minutes to every hour and the timer on the monitor shows that there
    are 5 minutes remaining in the current interval, the new interval goes into effect after the
    five minutes elapse and the test is run.

## See Also

- [Scheduling Testing and Monitoring](https://docs.mulesoft.com/api-functional-monitoring/bat-schedule-test-task)

- [Managing Permissions](https://docs.mulesoft.com/access-management/managing-permissions)
