Configure a Project Object (Managed Package)

For the managed package runtime, after creating a Project object, configure the object.

Managed Package app icon This information is for Omnistudio for Managed Packages. For Omnistudio on standard runtime, see Omnistudio Help.

  1. Configure the Source and Target. See steps 1 through 9 of Configure for Deployment Between Orgs (Managed Package).
  2. From the Project drop-down list, select Load Projects from Source.

    This retrieves active Project objects in the Source org that have a Status of Released.

  3. When the Project objects finish loading, select a Project object.
  4. To refresh comparison data whenever you save the workspace, make sure the Force refresh of data from orgs box is checked.
    "Force refresh of data from orgs" checkbox and Save button.
  5. Click Save.