---
schema_version: "1"
id: 3a978dca934e7e6fdef98226d487e86966bd4c4973d2a00d73cfe90334770204
title: Deploy EPC Datapacks
collection: admin
version: current
locale: en-us
portal_url: https://docs.salesforce.com/admin/current/en-us/ind/264-0-0/energy_lasm_deploy_epc_datapacks.md
canonical_url: https://help.salesforce.com/s/articleView?id=ind.energy_lasm_deploy_epc_datapacks.htm&release=264.0.0&type=5
source_site: help.salesforce.com
content_type: documentation
content_hash: 2289a66495c00e1ded663eb8e939c494bc9744a50fb5d8de57351d097db01967
description: After you download the EPC datapacks, migrate them to your Salesforce org.
products:
  - Energy and Utilities
release: "264"
---
# Deploy EPC Datapacks

After you download the EPC datapacks, migrate them to your Salesforce org.

Before you begin:

Be sure that you have configured your IDX Workbench environment. See [IDX Workbench Configuration for Deployment](https://help.salesforce.com/s/articleView?id=xcloud.os_idx_workbench_configuration_for_deployment.htm&type=5&language=en_US).

1. Create folders and extract the Vlocity datapack.
    1. Create a folder on your system named IDX Workbench.
    2. Inside the IDX Workbench folder, create a folder named vlocity and a folder named .vlocity.
    3. Extract the static resources datapack file in the **vlocity** folder.
    4. From the extracted content in the **vlocity** folder, move the .yaml project file to the **.vlocity** folder.
2. Open IDX Workbench.
3. Select components to migrate.
    1. In the Configure Workspace window, from the Source list, select your repository.
    2. From the Target list, select the target org where you want to deploy the components.
    3. From the Project list, select the project for your app.
    4. Click **Save**, then click **Save** again on the Configure Workspace window.
        
        The components to be migrated are loaded on the left panel.
4. To migrate the components, click **Actions** | **Migrate**.
    
    If the migration fails to move some components, select the ones that failed, then click **Migrate** again.

## Post EPC Datapack Deployment

Perform the following steps after deploying the EPC datapack on your org.

![Note](https://sf-zdocs-cdn-prod.zoominsoftware.com/tdta-ind-energy_utilities-264-0-0-production-enus/520849e5-9b41-4bae-b97b-d269cc2fce83/images/icon_note.png)

Note If you encounter errors deploying the EPC datapacks, see [Troubleshoot Large Account Sales Management](https://help.salesforce.com/s/articleView?id=ind.energy_lasm_troubleshoot.htm&release=264.0.0&type=5 "Troubleshoot issues that can occur in deploying Large Account Sales Management.").

### Activate pricing plan steps from default pricing plan

Activate these pricing plan steps in the default pricing plan after deploying the EPC datapack:

- Rating - Boiler Age
- Rating - Risk Area
- TaxRating

To activate a pricing plan step:

- Search for Default Pricing Plan in global search.
- In the Pricing Plan Steps section, click **View All**.
- Click the name of the Pricing Plan step you wish to edit.
- Click Edit.
- Select **Active**.
- Save the record.

### Run Maintenance Jobs

Run these standard administrative maintenance jobs and EPC jobs.

- Install Default Vlocity Objects and Layouts
- Create Default Pricing Variables and Bindings
- Clear Managed Platform Cache
- Product Hierarchy Maintenance with the option **Delete Old Data** selected.
- Refresh Platform Cache (Full)

For more details on running maintenance jobs see, [Administration Jobs Reference](https://help.salesforce.com/s/articleView?id=ind.comms_administration_jobs_for_industries_communications_media_and_energy.htm&type=5&language=en_US).