---
schema_version: "1"
id: a3ff74a0523c00b41ef12346f97984b874977ae693259c6bbffd969ced2684e1
title: Post-Upgrade Steps for Spring '25
collection: admin
version: current
locale: en-us
portal_url: https://docs.salesforce.com/admin/current/en-us/ind/264-0-0/comms_post_upgrade_steps_for_spring_25.md
canonical_url: https://help.salesforce.com/s/articleView?id=ind.comms_post_upgrade_steps_for_spring_25.htm&release=264.0.0&type=5
source_site: help.salesforce.com
content_type: documentation
content_hash: af8502899f314736157097f28ea9cdf5616e1826c725ff237d8991e2f5ade7e8
description: Perform the steps in this section to complete upgrade tasks for Industries Communications, Media, and Energy after you have installed the managed package.
products:
  - Communications
  - Media
  - Energy and Utilities
release: "264"
---
# Post-Upgrade Steps for Spring '25

Perform the steps in this section to complete upgrade tasks for Industries Communications, Media, and Energy after you have installed the managed package.

1. Run the [Attribute Override Batch job](https://help.salesforce.com/s/articleView?id=ind.comms_attribute_override_batch_job.htm&language=en_US).
2. Run diagnostics to check if your configuration settings are correct:
    
    - From the Vlocity CMT Administration page, click **Check Configurations Settings**.
    - Click **Check**.
    - Review the results and make any necessary adjustments. If any items are highlighted in red, follow the on-screen instructions to troubleshoot.
        
        To return to the Vlocity CMT Administration page, click Back to dashboard.
        
        For more information, see [CPQ Configuration Settings Reference](https://help.salesforce.com/s/articleView?id=ind.comms_t_cpq_configuration_settings_reference_148927.htm&language=en_US)
3. To upgrade the Vlocity Product Designer, see [Upgrade Vlocity Product Designer](https://help.salesforce.com/s/articleView?id=ind.comms_configure_product_designer_for_cme_upgrade__2.htm&release=264.0.0&type=5 "To use the Product Designer, complete the required configuration steps. The Product Designer provides a unified user experience with improved efficiency and agility to launch products quickly to market, giving both business and IT users access to all the product management capabilities they need.").
4. To upgrade the Vlocity Pricing Designer, see [Upgrade Vlocity Pricing Designer](https://help.salesforce.com/s/articleView?id=ind.comms_configure_vlocity_pricing_designer__upgrade_.htm&release=264.0.0&type=5 "To use the Vlocity Pricing Designer, assign a page layout, rename the Promotion tab, and verify the pricing tabs are visible. The Vlocity Pricing Designer provides a unified user experience with improved efficiency and agility to create and maintain product pricing, promotions, and associated rules, giving both business and IT users access to the pricing management capabilities they need.").
5. To deploy Industries CPQ in LWC.
    
    - For an org with OmniStudio Disabled: See [Deploy Industries CPQ in LWC with OmniStudio Disabled](https://help.salesforce.com/s/articleView?id=ind.comms_deploy_industries_cpq_in_lwc_with_omnistudio_disabled.htm&language=en_US)
    - For an org with OmniStudio Enabled: See [Deploy Industries CPQ in LWC with OmniStudio Enabled](https://help.salesforce.com/s/articleView?id=ind.comms_deploy_industries_cpq_in_lwc_with_omnistudio_enabled.htm&language=en_US)
6. To set up bulk operations such as bulk replacement for Change of Plans or bulk updates, see [Configure Bulk Processing](https://help.salesforce.com/s/articleView?id=ind.comms_configure_bulk_processing_for_change_of_plans.htm&release=264.0.0&type=5 "To replace offers in bulk, you must add a custom metadata type for ListToObjects. Otherwise, sales agents see \"Bulk Replace\" errors when they use the change of plans feature to replace offers in bulk.").
7. If you use Vlocity Contract Life Cycle Management (CLM), see [Post-Upgrade Steps for CLM for Communications, Media, and Energy](https://help.salesforce.com/s/articleView?id=ind.v_contracts_post_upgrade_steps_for_vlocity_clm_for_communicationsmediaand_energy_360686.htm&language=en_US).
8. If you use Industries Order Management (OM), see [Post Upgrade Steps for Order Management Winter '24](https://help.salesforce.com/s/articleView?id=ind.post_upgrade_steps_for_order_management_winter_24.htm&release=264.0.0&type=5 "Customers upgrading to Industries Order Management must follow some steps to get Order Management working as expected. Except when noted otherwise, these steps are valid for both OM Standard and OM Plus environments.").
9. If you use Industries Digital Commerce, see [Post-Upgrade Steps for Digital Commerce](https://help.salesforce.com/s/articleView?id=ind.comms_post_upgrade_steps_for_digital_commerce.htm&release=264.0.0&type=5 "To help prevent excess consumption of storage, clear all records from the CachedAPIResponse__c table after every major upgrade.").