---
schema_version: "1"
id: 92a56208099eff4897a5c572bfe03c26d16eff80cac034d020e735df0640d846
title: Edit a Calculated Insight Schedule
collection: admin
version: current
locale: en-us
portal_url: https://docs.salesforce.com/admin/current/en-us/data/264-0-0/c360_a_edit_a_calculated_insight_schedule.md
canonical_url: https://help.salesforce.com/s/articleView?id=data.c360_a_edit_a_calculated_insight_schedule.htm&release=264.0.0&type=5
source_site: help.salesforce.com
content_type: documentation
content_hash: e6d55a9eeba9964e095b268282dbdc1957196d84bdaa570baad9ddd734501172
description: In Data 360, you can change the schedule of calculated insights that are created with a SQL and the builder.
products:
  - Data 360
release: "264"
---
# Edit a Calculated Insight Schedule

In Data 360, you can change the schedule of calculated insights that are created with a SQL and the builder.

### Required Editions

<table class="slds-table slds-table_bordered slds-max-medium-table_stacked slds-m-bottom_small edition"><colgroup><col></colgroup><tbody><tr class=""><td class="slds-cell-wrap" style="vertical-align:top;">Available in: <strong>All Editions</strong> supported by Data 360. See <a href="https://help.salesforce.com/s/articleView?id=data.c360_a_dc_editions.htm&amp;release=264.0.0&amp;type=5" title="Data 360 is available in several supported Salesforce editions. Some Data 360 features also require additional licenses.">Data 360 edition availability</a>.</td></tr></tbody></table>

1. In Data Cloud, go to the Calculated Insights tab.
2. Open the calculated insight that you want to change.
3. On the top right, click the dropdown, and select **Schedule**.
4. Make your changes, and click **Save**.