---
schema_version: "1"
id: aa7a0deab93502baa75995b3ab1773aa77c0136f770a8a3bbc69450b88456b48
title: Configure Projected Predictions
collection: admin
version: current
locale: en-us
portal_url: https://docs.salesforce.com/admin/current/en-us/analytics/264-0-0/bi_edd_model_deploy_projected_prediction.md
canonical_url: https://help.salesforce.com/s/articleView?id=analytics.bi_edd_model_deploy_projected_prediction.htm&release=264.0.0&type=5
source_site: help.salesforce.com
content_type: documentation
content_hash: 86b842a47e5d567dcf627176f86527308ffa89647730516f36b0876d96149d1c
description: If the model is configured to derive a projected prediction, revise time frame settings as needed.
products:
  - CRM Analytics
  - Cross Cloud
release: "264"
---
# Configure Projected Predictions

If the model is configured to derive a projected prediction, revise time frame settings as needed.

![Deploy Model page showing the mapping interface](https://sf-zdocs-cdn-prod.zoominsoftware.com/tdta-analytics-bi-264-0-0-production-enus/ec791473-f5b4-4f64-a656-9104f455d966/bi/images/bi/bi_edd_model_deploy_projected_prediction.png)

To learn more, see [Configure Projected Predictions](https://help.salesforce.com/s/articleView?id=analytics.bi_edd_story_number_projected_predictions.htm&release=264.0.0&type=5 "Einstein Discovery allows you to provide trending data for numeric variables that factor into your predictions to make them more accurate. For example, you predict opportunity win/loss based on expected price fluctuations for raw materials. To factor price into your predicted outcome, use the Projected Predictions transformation and provide a dataset that projects the expected price for raw materials on the close date.").

1. Select a time frame option.
    
     
    | Field | Description |
    | --- | --- |
    | **N <intervals> from the current date** | Slide to select the number of intervals from the current date. |
    | **N <intervals> ahead of the <object> <date field>** | Slide to select the number of intervals, and then select the date field. |
    | **To the <object> <date field>** | Select the date field. |
2. Click **Next**.